Optimization of the CIP, the starts and the ramp-ups of packaging lines
Similon, Olivier
Promotor(s) : Bruls, Olivier ; Duysinx, Pierre
Date of defense : 25-Jun-2018/26-Jun-2018 • Permalink : http://hdl.handle.net/2268.2/4557
Details
Title : | Optimization of the CIP, the starts and the ramp-ups of packaging lines |
Translated title : | [fr] Optimization des CIP, des démarrages et des ramp-ups de lignes de packaging |
Author : | Similon, Olivier |
Date of defense : | 25-Jun-2018/26-Jun-2018 |
Advisor(s) : | Bruls, Olivier
Duysinx, Pierre |
Committee's member(s) : | Dewallef, Pierre
Gilet, Tristan Bernard, Nicolas |
Language : | English |
Number of pages : | 101 |
Keywords : | [fr] ramp-up [fr] inbev |
Discipline(s) : | Engineering, computing & technology > Mechanical engineering |
Target public : | Professionals of domain |
Institution(s) : | Université de Liège, Liège, Belgique |
Degree: | Master en ingénieur civil mécanicien, à finalité spécialisée en génie mécanique |
Faculty: | Master thesis of the Faculté des Sciences appliquées |
Abstract
[fr] The old packaging lines JB1 and JB3 of the ABInBev plant of Jupille present poor efficiency during
the starts occurring after stops of a few hours up to several days.
Indeed, the cleaning, starting and ramp-up processes are not optimal and face a lot of technical
problems but also important problems of organization and of process operation. There is a need
to improve them to gain time and then increase its productivity.
This work performs a detailed analysis of the problems encountered during these phases, based
on quantitative records and observations on the shop floor. The critical machines are identified
and the root causes of the problems are investigated.
A set of solutions and action plans are developed to solve the problems. One of the main solutions
is an organizational tool, the start document. It contains a chronogram for the CIP and the start
of the whole line, the process order for the preparation of the fillers and a ramp-up indicator.
Other smaller technical and organizational actions have also been set up on the lines.
Finally, results have been recorded to evaluate the global impact of the complete set of solutions
that has been developed during the whole duration of this work. The performance indicators
reveal an improvement of the start and ramp-up processes of the two lines.
File(s)
Document(s)
Description: Main text and appendices
Size: 12.08 MB
Format: Adobe PDF
Cite this master thesis
The University of Liège does not guarantee the scientific quality of these students' works or the accuracy of all the information they contain.