Feedback

HEC-Ecole de gestion de l'Université de Liège
HEC-Ecole de gestion de l'Université de Liège
MASTER THESIS
VIEW 57 | DOWNLOAD 0

Optimisation de la charge de travail sur un parc machines

Download
Göbbels, Charles ULiège
Promotor(s) : Crama, Yves ULiège
Date of defense : 22-Jun-2016 • Permalink : http://hdl.handle.net/2268.2/1540
Details
Title : Optimisation de la charge de travail sur un parc machines
Translated title : [fr] OPTIMISATION DE LA CHARGE DE TRAVAIL SUR UN PARC MACHINES
Author : Göbbels, Charles ULiège
Date of defense  : 22-Jun-2016
Advisor(s) : Crama, Yves ULiège
Committee's member(s) : Paquay, Célia ULiège
Peere, Isabelle ULiège
RENSONNET, Christophe 
Language : French
Number of pages : 134
Keywords : [fr] Supply Chain Management
[fr] CHARGE DE TRAVAIL
[fr] Bouchons de vin
Discipline(s) : Business & economic sciences > Production, distribution & supply chain management
Name of the research project : OPTIMISATION DE LA CHARGE DE TRAVAIL SUR UN PARC MACHINES
Target public : Student
Institution(s) : Université de Liège, Liège, Belgique
Degree: Master en ingénieur de gestion, à finalité spécialisée en Supply Chain Management and Business Analytics
Faculty: Master thesis of the HEC-Ecole de gestion de l'Université de Liège

Abstract

[en] Nomacorc has a highly volatile demand for the entire range of its products. To meet this variability, the factory has at its disposal a fixed machinery park and uses existing inventory. However, the demand for generic products only represents 17% of the total sales, which makes it difficult to produce large stocks in advance. Moreover, the production has a four day lead time for any received order. Therefore, the company faces a lack of production capacity.
This lack of capacity has been analysed during the project to understand the real causes. The results that emerged demonstrate that some production lines are not used to their full capacity, while others are. The problem of seasonal demand in the production line continues throughout the year.
The solution put forward in the project is to increase the machinery park’s flexibility to distribute the workload equally on each production line. Several proposals were given to the company during the project cycle. A program was created to address the impact of these different changes. It appears that Nomacorc could save up to 210.000€ each year by making these changes.
We would expect savings to be even higher if all unexpected events are taken into account. Indeed, if a machine fails or a sudden increase in demand appears during the year, the machinery park could be changed to adapt to these unforeseen events while it would not be possible with a less flexible machinery park.
By implementing this project, the production will be better prepared for the variability of demand. It will increase productivity while decreasing delays, overtime pay and inventory. By being more flexible, Nomacorc would better react to unexpected events and improve working conditions for employees, as well as returns for stockholders.


File(s)

Document(s)

File
Access MémoireCharlesGobbels.pdf
Description:
Size: 2.73 MB
Format: Adobe PDF

Annexe(s)

File
Access AIMMS-Charles.zip
Description: Documents AIMMS
Size: 133.71 kB
Format: Unknown

Author

  • Göbbels, Charles ULiège Université de Liège > Master ingé. gest., fin. spéc. supply chain man. (ex 2e ma.)

Promotor(s)

Committee's member(s)

  • Paquay, Célia ULiège Université de Liège - ULg > HEC-Ecole de gestion de l'ULg : UER > UER Opérations : Logistique
    ORBi View his publications on ORBi
  • Peere, Isabelle ULiège Université de Liège - ULg > HEC-Ecole de gestion de l'ULg : UER > UER Langues
    ORBi View his publications on ORBi
  • RENSONNET, Christophe
  • Total number of views 57
  • Total number of downloads 0










All documents available on MatheO are protected by copyright and subject to the usual rules for fair use.
The University of Liège does not guarantee the scientific quality of these students' works or the accuracy of all the information they contain.