Feedback

HEC-Ecole de gestion de l'Université de Liège
HEC-Ecole de gestion de l'Université de Liège
Mémoire
VIEW 140 | DOWNLOAD 2

Les partenariats public-privé : traitement statistique du PPP du tram de Liège

Télécharger
Leclercq, Julian ULiège
Promoteur(s) : Niessen, Wilfried ULiège
Date de soutenance : 11-jan-2017/18-jan-2017 • URL permanente : http://hdl.handle.net/2268.2/2280
Détails
Titre : Les partenariats public-privé : traitement statistique du PPP du tram de Liège
Auteur : Leclercq, Julian ULiège
Date de soutenance  : 11-jan-2017/18-jan-2017
Promoteur(s) : Niessen, Wilfried ULiège
Membre(s) du jury : Gautier, Axel ULiège
Schumesch, Patrice ULiège
Langue : Français
Nombre de pages : 80
Mots-clés : [en] PPP
[en] DBFM
[en] Risks and rewards
[en] SEC 2010
[en] Eurostat
Discipline(s) : Sciences économiques & de gestion > Comptabilité & audit
Sciences économiques & de gestion > Domaines particuliers de l'économie (santé, travail, transport...)
Institution(s) : Université de Liège, Liège, Belgique
Diplôme : Master en sciences de gestion, à finalité spécialisée en Financial Analysis and Audit
Faculté : Mémoires de la HEC-Ecole de gestion de l'Université de Liège

Résumé

[en] The case of the Liège tram is a very controversial subject, politically and financially speaking. The PPP market used for the tram is a DBFM market and has been refused three times by Eurostat. The transition from SEC 95 to SEC 2010 is a very important factor in this choice made by Eurostat, as it is now mandatory for public authorities to have the prior opinion of Eurostat for the acceptance of the off-balance sheet treatment.

The purpose of this thesis is to explain the various reasons that have led Eurostat to give three negative opinions for the PPP of the tram of Liège. Before doing this analysis, this thesis will define the concept of PPP and the various applicable European standards, analyze the situation of PPPs in Belgium and analyze the contract of the tram of Liège as well as the various players in this market. Secondly, the analysis of Eurostat's refusals will be based on an analysis of the risks and rewards of the PPP contract. Concerning the methodology, the guide on the statistical treatment of PPPs drawn up by EPEC in 2016, Eurostat and the EIB will serve as a basis for understanding the allocation of risks according to the public partner and the private partner.

The results show that the Walloon Region has failed to transfer the risks sufficiently to the private partner Mobiliège S.A. Indeed, the analysis of the private partner is the main cause of the first two negative opinions of Eurostat. In addition, the risk analysis indicates 10 problematic points for the initial contract, 3 problematic points for the first modified contract and 5 points for the second and final contract. This results in a risk threshold each time exceeded by the SRWT and the Walloon Region. Finally, the analysis of economic ownership is the third analysis that goes against the off-balance sheet treatment of the PPP.


Fichier(s)

Document(s)

File
Access Mémoire PPP tram de Liège.pdf
Description:
Taille: 7.47 MB
Format: Adobe PDF

Auteur

  • Leclercq, Julian ULiège Université de Liège > Master sc. gest., fin. spéc. fin. analysis & aud (ex 2e ma.)

Promoteur(s)

Membre(s) du jury

  • Nombre total de vues 140
  • Nombre total de téléchargements 2










Tous les documents disponibles sur MatheO sont protégés par le droit d'auteur et soumis aux règles habituelles de bon usage.
L'Université de Liège ne garantit pas la qualité scientifique de ces travaux d'étudiants ni l'exactitude de l'ensemble des informations qu'ils contiennent.