Feedback

HEC-Ecole de gestion de l'Université de Liège
HEC-Ecole de gestion de l'Université de Liège
MASTER THESIS

Mémoire-projet, (partim Mémoire)

Download
Ledent, Nicolas ULiège
Promotor(s) : Standaert, Willem ULiège
Date of defense : 1-Sep-2026 • Permalink : http://hdl.handle.net/2268.2/27764
Details
Title : Mémoire-projet, (partim Mémoire)
Author : Ledent, Nicolas ULiège
Date of defense  : 1-Sep-2026
Advisor(s) : Standaert, Willem ULiège
Committee's member(s) : Gaccio, Laurent 
Wouters, Sandrine ULiège
Language : English
Discipline(s) : Business & economic sciences > Marketing
Institution(s) : Université de Liège, Liège, Belgique
Degree: Master en sales management, à finalité spécialisée
Faculty: Master thesis of the HEC-Ecole de gestion de l'Université de Liège

Abstract

[fr] The Belgian energy sector is undergoing a profound transformation driven by electrification, decarbonization, and increasing grid complexity. Within this context, GE Vernova Grid Automation Belgium faces the challenge of sustaining growth while operating with limited resources and a strong dependence on a small number of strategic customers, particularly in the transmission segment.
This thesis investigates the most relevant and feasible growth opportunities for the company through a combination of literature review, market analysis, internal data, and semi-structured interviews with industry stakeholders. The analysis evaluates potential development axes based on market attractiveness, accessibility, portfolio fit, and execution feasibility.

The findings show that diversification into adjacent markets such as DSOs, industrial customers, and EPC-driven projects presents opportunities but also significant barriers related to competition, resource requirements, and market access. In contrast, the company’s installed base emerges as its most valuable strategic asset, offering opportunities for recurring revenue through services, maintenance, retrofits, and lifecycle management.

The study concludes that sustainable growth should be built on three priorities: strengthening service activities, protecting and expanding the transmission core business and selectively pursuing industrial opportunities through targeted partnerships. Instead of pursuing large diversification. Long-term success depends on leveraging existing strengths through a focused and disciplined growth strategy.


File(s)

Document(s)

File
Access GE Vernova Thesis.pdf
Description:
Size: 3.33 MB
Format: Adobe PDF

Author

  • Ledent, Nicolas ULiège Université de Liège > Mast. sales. man. à fin. spéc. (en alternance)

Promotor(s)

Committee's member(s)









All documents available on MatheO are protected by copyright and subject to the usual rules for fair use.
The University of Liège does not guarantee the scientific quality of these students' works or the accuracy of all the information they contain.