Feedback

HEC-Ecole de gestion de l'Université de Liège
HEC-Ecole de gestion de l'Université de Liège
Mémoire
VIEW 73 | DOWNLOAD 0

Optimisation de la performance de la ligne de production numéro 6

Télécharger
Leriche, Antonin ULiège
Promoteur(s) : Van Caillie, Didier ULiège
Date de soutenance : 18-jui-2019 • URL permanente : http://hdl.handle.net/2268.2/6438
Détails
Titre : Optimisation de la performance de la ligne de production numéro 6
Auteur : Leriche, Antonin ULiège
Date de soutenance  : 18-jui-2019
Promoteur(s) : Van Caillie, Didier ULiège
Membre(s) du jury : Pironet, Thierry ULiège
Pays, Isabelle ULiège
Dochier, Benjamin 
Langue : Français
Mots-clés : [en] Process optimization
[en] Production planning
[en] Sales analysis
[en] Process review
[en] Food industry
Discipline(s) : Sciences économiques & de gestion > Production, distribution & gestion de la chaîne logistique
Institution(s) : Université de Liège, Liège, Belgique
Diplôme : Master en ingénieur de gestion, à finalité spécialisée en Performance Management and Control
Faculté : Mémoires de la HEC-Ecole de gestion de l'Université de Liège

Résumé

[en] This project thesis has been conducted in the factory “Les Nutons” of the leader on the European market of fresh meals and lasagna : Ter Beke. The objective is to optimize the performance of the production line number 6. This report contains 3 parts. The first one is introductive. The company and my mission are presented. The second part includes all the analyses realized during this project thesis. The third section is dedicated to the recommendations and the conclusion.

The first analysis presented refers to a review of the current production process of the production line number 6 of the factory. The process is divided into different workstations which are described. The remuneration system and the work system are also detailed. The Overall Equipment Effectiveness is examined and then, a new work system is proposed. However, after taking into consideration the human aspects, the company has decided to not implement currently this proposition.

The second analysis details the sales of the different products manufactured on the production line. Different KPI such as the service level and the non-compliant rate allow us to draw interesting conclusions. This analysis brings to the fore the necessity to improve the quality of the sales forecasts and also highlights the impact of an increase of the use-by-date.

The third analysis sets up a new production planning. This model allows the company to harmonize the production weeks and in decreasing the total number of runs produced each week, to decrease losses caused by the periods of changes.

The last part of this project thesis includes all the recommendations drew thanks to the analysis and observations realized during 6 months. On the one hand, short-term recommendations could be implemented during the next few months. On the other hand, long-term recommendations are referred to more complex and more time requiring decisions.


Fichier(s)

Document(s)

File
Access Mémoire-AntoninLeriche.pdf
Description:
Taille: 1.79 MB
Format: Adobe PDF

Auteur

  • Leriche, Antonin ULiège Université de Liège > Master ingé. gest., à fin.

Promoteur(s)

Membre(s) du jury

  • Nombre total de vues 73
  • Nombre total de téléchargements 0










Tous les documents disponibles sur MatheO sont protégés par le droit d'auteur et soumis aux règles habituelles de bon usage.
L'Université de Liège ne garantit pas la qualité scientifique de ces travaux d'étudiants ni l'exactitude de l'ensemble des informations qu'ils contiennent.